Project Summary Newsome has efficiently completed the installation and commissioning of a modern 400 kW chiller at a leading confectionery manufacturing site in York. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing operational resilience and ensuring measurable reductions in both energy consumption and carbon emissions. https://thesocialcircles.com/story6467107/high-efficiency-400-kw-chiller-installation-achieves-fifty-thousand-pounds-annual-energy-savings-and-200-metric-tonnes-co%E2%82%82-saving